<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>County of El Dorado - File #: 19-0522</title><link>https://eldorado.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3923668&amp;GUID=35B0A6F0-88F8-44A2-B010-12159EF560C9</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://eldorado.legistar.com/Feed.ashx?M=LD&amp;ID=3923668&amp;GUID=35B0A6F0-88F8-44A2-B010-12159EF560C9" rel="self" type="application/atom+xml" /><item><title>County of El Dorado - File #: 19-0522</title><link>https://eldorado.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3923668&amp;GUID=35B0A6F0-88F8-44A2-B010-12159EF560C9</link><guid isPermaLink="false">35B0A6F0-88F8-44A2-B010-12159EF560C9-2020-09-03-22-39-39</guid><description>Title: Department of Transportation recommending the Board authorize changes outlined in Items 1 through 7 listed below to the proposed 2019 Capital Improvement Program (CIP), with return to the Board in September 2019 for adoption of the 2019 CIP; and further, recommending the Board add six new and two potential West Slope projects and one Tahoe project to the 2018 CIP, and one Airport project to the 2019 CIP, as explained in below. 
West Slope Road and Bridge Program:
1) Approve additions and changes to West Slope Road/Bridge CIP projects for inclusion in the 2019 CIP, as described in Attachments A and B.
Tahoe Environmental Improvement Program (EIP):
2) Approve additions and changes to the Five-Year Tahoe EIP as described in Attachments A and B.
Transportation Facility Improvement Program:
3) Include Headington Wash Rack Facility Project in the 2019 CIP, as described in attachments A and B.
Airport CIP:
4) Continue to fund Fiscal Year 2019/20 Airport CIP projects with Federal Aviation Administration grants and local matching funds, as shown in Attachments A and B.
Capital Overla</description><pubDate>Thu, 03 Sep 2020 22:39:39 GMT</pubDate></item></channel></rss>