File #: 25-0903    Version: 1
Type: Agenda Item Status: Consent Calendar
File created: 5/6/2025 In control: Board of Supervisors
On agenda: 6/24/2025 Final action:
Title: Department of Transportation recommending the Board approve and authorize the Chair to sign the Reimbursement Memorandum of Understanding with the El Dorado County Water Agency, not to exceed $80,000, with a term through June 30, 2027, as part of the El Dorado Drainage Improvement Project (along Pleasant Valley Road), to complete the Drainage Study and Environmental Planning, Capital Improvement Program number 36106004. (District 2) FUNDING: Regional Surface Transportation Program Funds - Caltrans Local Assistance (37%) and To Be Determined (63% - see “Financial Impact” section of the staff report). (Federal Funds)
Attachments: 1. A - Approved Counsel Review Sheet, 2. B - MOU
Related files: 22-1882
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Department of Transportation recommending the Board approve and authorize the Chair to sign the Reimbursement Memorandum of Understanding with the El Dorado County Water Agency, not to exceed $80,000, with a term through June 30, 2027, as part of the El Dorado Drainage Improvement Project (along Pleasant Valley Road), to complete the Drainage Study and Environmental Planning, Capital Improvement Program number 36106004.

(District 2)

 

FUNDING:  Regional Surface Transportation Program Funds - Caltrans Local Assistance (37%) and To Be Determined (63% - see “Financial Impact” section of the staff report). (Federal Funds)

Body

DISCUSSION / BACKGROUND

The Department of Transportation (Transportation) is currently in the environmental planning and design phase for the El Dorado Drainage Improvement Project (Project) and is in the process of issuing a Request for Proposal (RFP) to commence the Drainage Study for the Project. Transportation staff have conducted a map and record search, utility coordination, preliminary watershed analysis, and alternative studies. The El Dorado County Water Agency (EDWA) is partnering with Transportation to produce the Drainage Study for the Slate Creek watershed and drainage infrastructure in the town of El Dorado to improve drainage in the area. This Drainage Study evaluating the town of El Dorado will be split into two (2) phases of work:

                     Phase 1: Focuses on the overall Slate Creek watershed; and

                     Phase 2: Focuses on infrastructure within Pleasant Valley Road in County right-of-way and the town of El Dorado.

 

The Memorandum of Understanding (MOU) outlines the responsibilities between the County and EDWA. EDWA has agreed to pay the County 50% of the total actual amount of the Phase 1 Drainage Study work, not to exceed $80,000, as a one-time funding contribution for the cost to complete the Drainage Study and environmental planning for the Project. The County and EDWA agree that the payment from EDWA is for planning, study, and design purposes and no such funds will contribute to or fund actual construction of the improvements.

 

ALTERNATIVES

The Board could choose not to approve the MOU and provide direction on an alternate agreement.

 

PRIOR BOARD ACTION

On November 8, 2022 (Legistar 22-1882), the Board accepted the Regional Surface Transportation Program (RSTP) funds for the Project.

 

OTHER DEPARTMENT / AGENCY INVOLVEMENT

County Counsel has reviewed and approved the MOU.

 

CAO RECOMMENDATION / COMMENTS

Approve as recommended.

 

FINANCIAL IMPACT

The current RSTP grant funds will fund the preliminary environmental, design, and right of way phases of the Project. The “Funding” section of the staff report indicates that 63% of the overall Project funding is “To Be Determined.” This is because the Project is currently seeking construction grant funds. There is no change to net County cost resulting from approval of the proposed MOU. Funding for the Project is included in Transportation’s 2024 Capital Improvement Program, which was approved by the Board on June 18, 2024, Legistar file 24-0838.

 

CLERK OF THE BOARD FOLLOW UP ACTIONS

1) The Clerk of the Board will obtain the Chair’s signature on one (1) original of the MOU.

2) The Clerk of the Board will forward one (1) fully executed copy of the MOU to Transportation, Fairlane Engineering, Attn: Shanann Findley.

 

STRATEGIC PLAN COMPONENT

Priority: N/A

Action Item: N/A

 

CONTACT

Rafael Martinez, Director

Department of Transportation