Skip to main content
File #: 25-1923    Version: 1
Type: Agenda Item Status: Consent Calendar
File created: 11/12/2025 In control: Board of Supervisors
On agenda: 2/3/2026 Final action:
Title: Department of Transportation recommending the Board to approve and authorize the Chair to sign Amendment 1 to Cooperative Agreement 03-0817 with the State of California Department of Transportation, updating funding allocations of the Pioneer Trail / U.S. Highway 50 Intersection Safety Improvement Project, CIP 36104026. (District 5) FUNDING: Highway Safety Improvement Program (29% - Federal), Tahoe Regional Planning Agency Mitigation Funds (2% - Local), Congestion Mitigation and Air Quality Program (22% - Federal), Surface Transportation Block Grant (21% - Federal), and State and Local Partnership (26% - State).
Attachments: 1. A - Counsel Approval, 2. B - 03-0817 A1 - EA 2H610, 3. C - 03-0817 Original FE
Related files: 23-2068
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Department of Transportation recommending the Board to approve and authorize the Chair to sign Amendment 1 to Cooperative Agreement 03-0817 with the State of California Department of Transportation, updating funding allocations of the Pioneer Trail / U.S. Highway 50 Intersection Safety Improvement Project, CIP 36104026.

(District 5)

 

FUNDING:  Highway Safety Improvement Program (29% - Federal), Tahoe Regional Planning Agency Mitigation Funds (2% - Local), Congestion Mitigation and Air Quality Program (22% - Federal), Surface Transportation Block Grant (21% - Federal), and State and Local Partnership (26% - State).

Body

DISCUSSION / BACKGROUND

On December 12, 2023 (Legistar file 23-2068), the Board approved Cooperative Agreement 03-0817 establishing a partnership between Caltrans and the County of El Dorado to convert the US 50 / SR 89 and Pioneer Trail signalized intersection into a modern roundabout.  The agreement programmed a total of $3,055,000 in SB-1 Local Partnership Program funds, specifying how much could be spent for construction support and construction capital.

 

Amendment No. 1 updates funding allocations by reducing Construction Support from $458,250 to $169,650 while increasing Construction Capital from $2,596,750 to $2,885,350. There is no change to the total funding amount. All other terms of the original agreement remain unchanged, and the amendment is formally incorporated into the existing contract.

 

ALTERNATIVES

1) The Board could choose not to approve the Cooperative Agreement.  Transportation would attempt to work with Caltrans to revise the agreement as directed by the Board and return at a later date.

 

PRIOR BOARD ACTION

See Discussion/Background above.

 

OTHER DEPARTMENT / AGENCY INVOLVEMENT

Caltrans, County Counsel 

 

CAO RECOMMENDATION

Approve as recommended.

 

FINANCIAL IMPACT

The Project is included in the 2025 CIP approved by the Board on July 15, 2025, (Legistar file 25-0504), with funding provided by Local, State, and Federal funds. There is no change to Net County Cost as a result of Amendment No. 1 to Cooperative Agreement 03-0817.

 

CLERK OF THE BOARD FOLLOW UP ACTIONS

1) The Clerk of the Board will obtain Chair signature on four (4) originals of each Amendment.

2) The Clerk of the Board will forward the signed four (4) originals of each Amendment to Matt Gourley at Transportation for transmittal to Caltrans for final signature.

3) Upon receipt of the fully executed original Amendment from Caltrans, Transportation will forward one (1) original of each Amendment to the Clerk of the Board for filing.

 

STRATEGIC PLAN COMPONENT

N/A

 

CONTACT

Rafael Martinez, Director

Department of Transportation