File #: 12-1493    Version: 1
Type: Agenda Item Status: Approved
File created: 11/30/2012 In control: Board of Supervisors
On agenda: 12/11/2012 Final action: 12/11/2012
Title: Supervisor Briggs recommending the Board consider the following: 1) Receive and file presentation by the Department of Transportation on the Revised Draft National Pollutant Discharge Elimination System (NPDES) Permit for the Discharge of Storm Water from Phase II Small Municipal Separate Storm Sewer Systems (MS4) as released for comment by the State Water Quality Control Board; 2) Discuss the Revised Draft Phase II Small MS4 Permit mandated by the California State Water Resources Control Board; and, 3) Authorize the Chair to sign a letter to the California State Water Resources Control Board containing the County of El Dorado's comments on the Revised Draft Phase II Small MS4 Permit. (Est. Time: 20 Min.)
Attachments: 1. A - Draft MS4 Permit Comment Ltr.pdf, 2. B - MS4 Permit Presentation.pdf, 3. C- July 5 2011 Memo.pdf, 4. D - Sept 8 2011 Ltr.pdf, 5. E - MS4 Permit Cost Estimate Summary.pdf
Title
Supervisor Briggs recommending the Board consider the following:
1) Receive and file presentation by the Department of Transportation on the Revised Draft National Pollutant Discharge Elimination System (NPDES) Permit for the Discharge of Storm Water from Phase II Small Municipal Separate Storm Sewer Systems (MS4) as released for comment by the State Water Quality Control Board;
2) Discuss the Revised Draft Phase II Small MS4 Permit mandated by the California State Water Resources Control Board; and,
3) Authorize the Chair to sign a letter to the California State Water Resources Control Board containing the County of El Dorado's comments on the Revised Draft Phase II Small MS4 Permit.   (Est. Time: 20 Min.)
Body
The State Water Quality Control Board released the Draft Permit on November 16, 2012.  Comments are due to the State Water Quality Board by December 17, 2012.
 
Earlier County of El Dorado correspondence related to the Draft and Revised Draft Phase II Small MS4 Permit is attached.