File #: 07-225    Version:
Type: Agenda Item Status: Approved
File created: 1/31/2007 In control: Board of Supervisors
On agenda: 2/27/2007 Final action: 2/27/2007
Title: Transportation Department reporting on the status of the preferred detour option for the traffic handling plan for the Bass Lake Road improvement project. (Referred 2/13/07, Item 35) FUNDING: Developer advanced project with reimbursement from Traffic Impact Mitigation fees.
Attachments: 1. DETOUR_REV, 2. Bass Lake Road Detour reprint letter size.pdf, 3. email rcvd 2-23-07 from John Thomson.pdf, 4. emails rcvd 2-26-07.pdf, 5. additional emails for Bass Lake Rd. 2-26-07.pdf, 6. email rcvd 2-26-07 from S. Colvin.pdf
Title
Transportation Department reporting on the status of the preferred detour option for the traffic handling plan for the Bass Lake Road improvement project. (Referred 2/13/07, Item 35)

FUNDING: Developer advanced project with reimbursement from Traffic Impact Mitigation fees.

Body

BUDGET SUMMARY:
Estimated Incremental Cost $ 0

Funding
Budgeted $
New Funding $
Savings $
Other * $
Total Funding Available $ $ 0
Change To Net County Cost $ 0



Fiscal Impact/Change to Net County Cost:
All options that utilize a detour alignment (Options 1, 2, & 4) will shorten the construction duration of the project and introduce both safety and cost savings. There is no impact on General Fund net County Cost.

The improvements to Bass Lake Road are reimbursable through Traffic Impact Mitigation (TIM) fees and a portion of the detour may potentially be funded by the Bass Lake Hills Specific Plan, Public Facilities Financing Plan (PFFP). Any savings associated with the use of PFFP roadways for the detour will be shared between the TIM Fee program and the PFFP. The proposed distribution of any potential savings between the TIM Fee program and the PFFP is currently being negotiated and will be presented to your Board with the Reimbursement Agreement at a future meeting.

Background:
As part of the Bass Lake Hills Specific Plan, DR Horton is required to reconstruct Bass Lake Road from Highway 50 to Hollow Oak Road to satisfy conditions on their three subdivision maps. This reconstruction will improve the alignment and provide for a divided two lane roadway in lieu of the existing substandard roadway. The reconstruction project is anticipated to take approximately 15 months. There are four alternative traffic handling strategies for the construction of the project as shown on the attached exhibit entitled “Bass Lake Road - Exhibit Map for Detour Options” and as described below:

Option 1...