File #: 18-1692    Version: 1
Type: Agenda Item Status: Approved
File created: 10/23/2018 In control: Board of Supervisors
On agenda: 1/29/2019 Final action: 1/29/2019
Title: Department of Transportation (Transportation), recommending the Board authorize Transportation to proceed with ordering title reports, certified appraisals, and to enter into negotiations with the owners, or their designated representatives and commence with the acquisition process for the Enterprise Drive/Missouri Flat Road Signalization Project, CIP 73365 affecting portions of the following subject parcels: 1) APN 329-260-06, Placerville Fruit Growers Association; 2) APN 329-270-10, Pacific Gas & Electric Co.; 3) APN 329-261-17, Frances G. Shenefield; 4) APN 329-261-18, Frances G. Shenefield; 5) APN 329-261-23, John Keller Meyer and Catherine C. Meyer, Trustees of The John Keller Meyer and Catherine Crow Meyer Revocable Trust, Dated November 6, 1991; 6) APN 329-261-19, John Keller Meyer and Catherine C. Meyer, Trustees of The John Keller Meyer and Catherine Crow Meyer Revocable Trust, Dated November 6, 1991; and 7) APN 329-261-22, Jeffrey R. Gutierrez. FUNDING: Funding for this Pro...
Attachments: 1. A - Vicinity Map
Related files: 18-0616, 18-1493
Title
Department of Transportation (Transportation), recommending the Board authorize Transportation to proceed with ordering title reports, certified appraisals, and to enter into negotiations with the owners, or their designated representatives and commence with the acquisition process for the Enterprise Drive/Missouri Flat Road Signalization Project, CIP 73365 affecting portions of the following subject parcels:
1) APN 329-260-06, Placerville Fruit Growers Association;
2) APN 329-270-10, Pacific Gas & Electric Co.;
3) APN 329-261-17, Frances G. Shenefield;
4) APN 329-261-18, Frances G. Shenefield;
5) APN 329-261-23, John Keller Meyer and Catherine C. Meyer, Trustees of The John Keller Meyer and Catherine Crow Meyer Revocable Trust, Dated November 6, 1991;
6) APN 329-261-19, John Keller Meyer and Catherine C. Meyer, Trustees of The John Keller Meyer and Catherine Crow Meyer Revocable Trust, Dated November 6, 1991; and
7) APN 329-261-22, Jeffrey R. Gutierrez.

FUNDING: Funding for this Project is provided by Tribe Funds (80%) and Traffic Impact Mitigation Fees - Zones 1 through 7 (20%) (Local Funds).
Body
DISCUSSION/BACKGROUND
The Enterprise Drive/Missouri Flat Road intersection was identified in the 2018 Intersection Needs Prioritization Summary as currently operating unacceptably at LOS F during both peak hours and has met the peak hour signal warrant in recent years. The analysis/data suggests that motorists may be avoiding the intersection due to the high delay. The Enterprise Drive/Missouri Flat Road Signalization Project (Project) proposes to signalize the intersection of Missouri Flat Road and Enterprise Drive; including the installation of new traffic signal controller and cabinet, detector loops, and widening of both Missouri Flat Road and Enterprise Drive to accommodate turn lanes.
Missouri Flat Road will be widened north and south of the intersection for right and left turn lanes. Enterprise Drive will be widened to accommodate a left turn lane...

Click here for full text