File #: 24-0838    Version: 1
Type: Agenda Item Status: Approved
File created: 4/29/2024 In control: Board of Supervisors
On agenda: 6/18/2024 Final action: 6/18/2024
Title: Department of Transportation recommending the Board: 1) Adopt and authorize the Chair to sign Resolution 110-2024 and adopt the 2024 Capital Improvement Program (CIP) as presented in Attachment E; 2) Include new project, Intelligent Transportation System Control Center, CIP 36106005, to the 2024 CIP; and 3) Include new project, Latrobe West Connector, CIP 36105084, to the 2024 CIP. FUNDING: Federal, State, and Local Sources. Local funding sources may include any combination of the following: Traffic Impact Fee Program, Missouri Flat Area Master Circulation and Financing Plan, Road Fund, Tribe Fund, Accumulative Capital Outlay, Developer Advanced Funds, Sacramento Municipal Utility District Funds, and/or General Fund.
Attachments: 1. A - Approved Resolution Routing Sheet, 2. B - 2024 CIP Book Adoption Resolution, 3. C - Planning Commission Finding of Consistency, 4. D - 2024 Project Change Table, 5. E - Proposed 2024 CIP Book, 6. Executed Resolution 110-2024
Related files: 20-1585, 24-0239, 24-0408, 24-0616
Title
Department of Transportation recommending the Board:
1) Adopt and authorize the Chair to sign Resolution 110-2024 and adopt the 2024 Capital Improvement Program (CIP) as presented in Attachment E;
2) Include new project, Intelligent Transportation System Control Center, CIP 36106005, to the 2024 CIP; and
3) Include new project, Latrobe West Connector, CIP 36105084, to the 2024 CIP.

FUNDING: Federal, State, and Local Sources. Local funding sources may include any combination of the following: Traffic Impact Fee Program, Missouri Flat Area Master Circulation and Financing Plan, Road Fund, Tribe Fund, Accumulative Capital Outlay, Developer Advanced Funds, Sacramento Municipal Utility District Funds, and/or General Fund.
Body
DISCUSSION / BACKGROUND
The Capital Improvement Program (CIP) is the long-range plan for all individual transportation capital improvement projects, including cost estimates, schedules, and funding sources. It provides strategic direction for capital projects over a current year, 5-, 10-, and 20-year horizon. The CIP is used by the Department of Transportation (Transportation) as a planning tool and is updated annually as new information becomes available regarding Board priorities, funding sources, project cost estimates, and timing.

In order to ensure that traffic generated by growth consistent with the General Plan does not exceed available roadway capacity, the County is required to implement General Plan Policy TC-Xb and Implementation Measures TC-A and TC-B. General Plan Policy TC-Xb and Implementation Measure TC-A requires the County to prepare an annual CIP for the West Slope Road/Bridge Program specifying expenditures for roadway improvements within the next 10 years.

General Plan Policy TC-Xb and Implementation Measure TC-A also require a Major CIP and Traffic Impact Mitigation (TIM) Fee Program update every five years, concurrent with the major review of the General Plan, specifying expenditures for roadway improvements wit...