Skip to main content
File #: 26-0371    Version: 1
Type: Agenda Item Status: Consent Calendar
File created: 2/12/2026 In control: Board of Supervisors
On agenda: 3/3/2026 Final action:
Title: Planning and Building Department, Planning Division, submitting for approval of a Final Map (TM-F25-0003) for Unit 8A of the East Ridge Village Subdivision (TM14-1521), creating a total of fifty (50) residential lots, seven (7) lettered lots, and one (1) large lot, on property identified by Assessor’s Parcel Numbers 119-390-032, 119-390-033, 119-390-034, and 119-390-072 (Attachment E, Exhibit A) located on the southeast side of Valley View Parkway, approximately 0.58 miles east of the intersection with Blackstone Parkway, in the El Dorado Hills area (Attachment E, Exhibit B), and recommending the Board: 1) Approve Final Map TM-F25-0003 for East Ridge Village Unit 8A (Attachment E, Exhibit C); and 2) Approve and authorize the Chair to sign the Agreement to Make Subdivision Improvements (Attachment B). (District 2) FUNDING: Developer-Funded.
Attachments: 1. A - Approved Counsel Routing Sheet, 2. B - Agreement to Make Subdivision Improvements, 3. C - Performance Bond Agreement Form, 4. D - Laborers and Materialmens Bond Form, 5. E - Exhibits A-F, 6. F - Verification of Final Map Conformance with Conditions of Approval
Related files: 25-1820, 15-0660, 23-1311
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Planning and Building Department, Planning Division, submitting for approval of a Final Map (TM-F25-0003) for Unit 8A of the East Ridge Village Subdivision (TM14-1521), creating a total of fifty (50) residential lots, seven (7) lettered lots, and one (1) large lot, on property identified by Assessor’s Parcel Numbers 119-390-032, 119-390-033, 119-390-034, and 119-390-072 (Attachment E, Exhibit A) located on the southeast side of Valley View Parkway, approximately 0.58 miles east of the intersection with Blackstone Parkway, in the El Dorado Hills area (Attachment E, Exhibit B), and recommending the Board:
1) Approve Final Map TM-F25-0003 for East Ridge Village Unit 8A (Attachment E, Exhibit C); and
2) Approve and authorize the Chair to sign the Agreement to Make Subdivision Improvements (Attachment B).
(District 2)

FUNDING: Developer-Funded.
Body
DISCUSSION / BACKGROUND
The East Ridge Village Subdivision is a 734-acre project that previously received the following entitlements:
-Large-Lot Tentative Subdivision Map (Phase 0) creating 66 large lots for financing and phasing purposes, ranging in size from 0.06 acres to 58 acres;
-Small-Lot Tentative Subdivision Map creating a total of 759 lots consisting of 701 residential lots, 41 landscape lots, 12 roadway lots, two recreational park lots, one sewer lift station lot, one water tank lot, and one pump station lot.

This request is for a Final Map for Unit 8A. Whereas a Tentative Subdivision Map shows conceptual design, including proposed layout, topography and improvements, the Final Map establishes legal lot lines, easements and dedications which are recorded with the County Surveyor. The Tentative Map also sets the conditions for approval that must be fulfilled, whereas the Final Map process verifies those conditions have been met before the Final Map is recorded.

East Ridge Village Unit 8A Final Map creates a total of fifty (50) residential lots, seven (7) lettered lots, and one (1) large lot, rangi...

Click here for full text