File #: 24-0148    Version: 1
Type: Agenda Item Status: Approved
File created: 1/10/2024 In control: Board of Supervisors
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Department of Transportation recommending the Board consider the following pertaining to Contract 8357 for the 2024 DOT Maintenance Pavement Rehabilitation Projects on Sly Park Road, Snows Road, Mount Aukum Road, El Dorado Road, Echo Lane, Runnymeade Road, Salmon Falls Road, Green Valley, Road Merrian Lane, Merrian Court, Olson Lane, Pecheco Court, Standford Lane, and Warren Lane: 1) Approve and adopt the Contract Documents; and 2) Authorize advertisement for bids. FUNDING: Road Repair and Rehabilitation Act 2017 (SB1-RMRA) (85%), Discretionary Transient Occupancy Tax (15%), (No Federal Funds)
Attachments: 1. A - Approved Blue, 2. B - 2024 DOT Grind and Pave Contract Docs
Related files: 24-0540
Title
Department of Transportation recommending the Board consider the following pertaining to Contract 8357 for the 2024 DOT Maintenance Pavement Rehabilitation Projects on Sly Park Road, Snows Road, Mount Aukum Road, El Dorado Road, Echo Lane, Runnymeade Road, Salmon Falls Road, Green Valley, Road Merrian Lane, Merrian Court, Olson Lane, Pecheco Court, Standford Lane, and Warren Lane:
1) Approve and adopt the Contract Documents; and
2) Authorize advertisement for bids.

FUNDING: Road Repair and Rehabilitation Act 2017 (SB1-RMRA) (85%), Discretionary Transient Occupancy Tax (15%), (No Federal Funds)
Body
DISCUSSION / BACKGROUND
The purpose of the 2024 DOT Maintenance Pavement Rehabilitation Projects (Project) is to repair various roadway sections on Sly Park Road, Snows Road, Mount Aukum Road, El Dorado Road, Echo Lane, Runnymeade Road, Salmon Falls Road, Green Valley Road, Merrian Lane, Merrian Court, Olson Lane, Pecheco Court, Stanford Lane, and Warren Lane in the respective communities of Pollock Pines, Camino, Placerville, Somerset, and El Dorado Hills areas of El Dorado County by removing the failing asphalt section and replacing with hot mix asphalt. Due to current Americans with Disability Act (ADA) requirements and regulations, one (1) existing non-standard curb ramps within the Project area are required to be brought up to current standards as part of the Project. Contract #8357 is estimated to have a construction phase total cost of $6,250,000. All of the roads listed above were identified on the FY 23/24 SB1 Resolution, with the exception of Snows Road.

This Project does not have federal funding; thus, only California Environmental Quality Act (CEQA) compliance is required. A CEQA Notice of Exemption was submitted on January 18, 2024. This Project does not require any environmental permits or additional right of way to be acquired.

ALTERNATIVES
1) The Board could choose not to approve the Contract Documents. Transportation will make any chang...

Click here for full text