File #: 25-1920    Version: 1
Type: Agenda Item Status: Consent Calendar
File created: 11/12/2025 In control: Board of Supervisors
On agenda: 1/6/2026 Final action:
Title: Department of Transportation recommending the Board consider the following pertaining to Contract 9966 for the 2026 DOT SLT Maintenance Pavement Rehabilitation Projects on Cedar Ridge Road, Pioneer Trail Frontage Road, Washoan Boulevard, Thunderbird Drive, Southern Pines Drive, Navahoe Driver, E San Bernardino Avenue, San Diego Street, Hopi Avenue, Bellevue Avenue, Scenic Drive, Tahoe Mountain, Mt Diablo Circle, Granite Mountain Circle and Mountain Meadows Drive: 1) Approve and adopt the Contract Documents; and 2) Authorize advertisement for bids. (District 5) FUNDING: Transient Occupancy Tax - Measure S (67%) and Road Fund (33%) (No federal funds).
Attachments: 1. A - 9966 Approved Blue, 2. B - 9966 Bid Documents
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Department of Transportation recommending the Board consider the following pertaining to Contract 9966 for the 2026 DOT SLT Maintenance Pavement Rehabilitation Projects on Cedar Ridge Road, Pioneer Trail Frontage Road, Washoan Boulevard, Thunderbird Drive, Southern Pines Drive, Navahoe Driver, E San Bernardino Avenue, San Diego Street, Hopi Avenue, Bellevue Avenue, Scenic Drive, Tahoe Mountain, Mt Diablo Circle, Granite Mountain Circle and Mountain Meadows Drive:
1) Approve and adopt the Contract Documents; and
2) Authorize advertisement for bids.
(District 5)

FUNDING: Transient Occupancy Tax - Measure S (67%) and Road Fund (33%) (No federal funds).
Body
DISCUSSION / BACKGROUND
The purpose of the 2026 SLT DOT Maintenance Pavement Rehabilitation Projects (Project) is to repair various roadway sections on Cedar Ridge Road, Pioneer Trail Frontage Road, Washoan Boulevard, Thunderbird Drive, Southern Pines Drive, Navahoe Drive, E San Bernardino Avenue, San Diego Street, Hopi Avenue, Bellevue Avenue, Scenic Drive, Tahoe Mountain, Mt Diablo Circle, Granite Mountain Circle and Mountain Meadows Drive in South Lake Tahoe and Tahoma areas of El Dorado County by removing the failing asphalt section and replacing with hot mix asphalt. Contract #9966 is estimated to have a construction phase total cost of $1,515,000, and will be completed in the spring and summer of 2026.

This Project does not have federal funding; thus, only California Environmental Quality Act (CEQA) compliance is required. A CEQA Notice of Exemption was submitted on December 10, 2025. This Project does not require any environmental permits or additional right of way to be acquired.

ALTERNATIVES
1) The Board could choose not to approve the Contract Documents. Transportation will make any changes requested by the Board and return at a later date.
2) The Board could choose not to authorize advertisement for construction bids. Transportation will make any changes requested by the Board and return...