Title: Environmental Management Department recommending the Board consider the following pertaining to the Union Mine Wastewater Treatment Plant Centrifuge Control Panels: 1) Approve and adopt the construction plans and specifications and authorize the chair to sign the bid documents; and 2) Authorize the advertisement for construction bids (BID Number 2025-0107) in the Quest Construction Data Network. FUNDING: Non-General Fund / CSA 10 Liquid Waste Funds.
Attachments: 1. A - Dept. Approval Form, 2. B - Blue Routing Sheet, 3. C - BID #2025-0107
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title Environmental Management Department recommending the Board consider the following pertaining to the Union Mine Wastewater Treatment Plant Centrifuge Control Panels:

1) Approve and adopt the construction plans and specifications and authorize the chair to sign the bid documents; and

2) Authorize the advertisement for construction bids (BID Number 2025-0107) in the Quest Construction Data Network.

 

FUNDING:  Non-General Fund / CSA 10 Liquid Waste Funds.

Body

DISCUSSION / BACKGROUND

The Union Mine WWTP Facility, located at 5700 Union Mine Road, has been in operation since 1996. The facility has 2 centrifuges that separate solids and wastewater for further treatment. Centrifuge #2 was replaced in 2000 with a GEA Westfalia unit, and centrifuge #1 was replaced in 2004, also with a GEA Westfalia unit.

 

Centrifuge #1 has been inoperable for 7 years due to a control panel malfunction and lack of available parts and companies for repair. This project will allow for two new updated control panels to be installed, which will allow both centrifuges to function properly and maintain the facility in operation. 

 

ALTERNATIVES

The Board may choose to deny the approval of this construction project. This would inhibit Environmental Management’s ability to effectively process and remove solids from the wastewater treatment plant and ultimately leading to the closure of the treatment plant.

 

PRIOR BOARD ACTION

N/A

 

CAO RECOMMENDATION/COMMENTS

Approve as recommended.

 

FINANCIAL IMPACT

There is no change to Net County Costs associated with this item. The Fiscal Year 2025-26 recommended budget includes sufficient funding for this project. 

 

CLERK OF THE BOARD FOLLOW UP ACTIONS

N/A 

STRATEGIC PLAN COMPONENT

Public Infrastructure

 

CONTACT

Jeffrey Warren, REHS

Director of Environmental Management