File #: 21-0655    Version: 1
Type: Agenda Item Status: Approved
File created: 4/12/2021 In control: Board of Supervisors
On agenda: 5/11/2021 Final action: 5/11/2021
Title: Department of Transportation recommending the Board consider the following pertaining to the Road Safety Improvements at Various Locations, Capital Improvement Program project number 72195/36105060, Contract 5415, with an estimated construction phase total cost of $1,482,300: 1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and 2) Authorize advertisement for construction bids. FUNDING: Highway Safety Improvement Program (100%). (Federal Funds)
Attachments: 1. A - Counsel Approval, 2. B - 5415 Contract Docs
Related files: 21-0908
Title
Department of Transportation recommending the Board consider the following pertaining to the Road Safety Improvements at Various Locations, Capital Improvement Program project number 72195/36105060, Contract 5415, with an estimated construction phase total cost of $1,482,300:
1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and
2) Authorize advertisement for construction bids.

FUNDING: Highway Safety Improvement Program (100%). (Federal Funds)
Body
DISCUSSION / BACKGROUND
The Road Safety Improvements at Various Locations Project (Project) will consist of the removal of existing pavement striping and markers, installation of high friction surface treatment, new enhanced wet-night thermoplastic striping, raised pavement markers, and advanced warning signs. The high friction surface treatment will be applied at the following 15 locations: South Shingle Road at Silver Oaks Lane, South Shingle Road at Fernwood Drive, Cedar Ravine Road at Elysian Way, Forni Road and Ivy Trail, Slypark Road at Mayflower Road, Forni Road at Wamego Road, Greenstone Road at Greenstone Cutoff, Meatty Drive at Alexandra Drive, Meder Road at Resler Way, Bucks Bar Road at Palace Lane, Cameron Park Road at Hacienda Road, Cedar Ravine Road at Camp Nauvoo Road, Cambridge Road at Knollwood Drive, Salmond Falls Road at Persia Lane, and Mother Load Drive at Ridge Drive. The Project duration is 35 working days.

Due to federal funding, both California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) compliance are required. A CEQA Notice of Exemption was filed on November 18, 2019. A California Department of Transportation (Caltrans) NEPA Categorical Exemption/Categorical Exclusion Determination was issued on December 13, 2019. No environmental permits were required for this Project.

A Caltrans Encroachment permit was required for this project. The Department of Transportation received an encroachment permit f...