File #: 07-636    Version: 1
Type: Agenda Item Status: Approved
File created: 3/12/2007 In control: Board of Supervisors
On agenda: 5/15/2007 Final action: 5/15/2007
Title: Transportation Department recommending the Board find that the construction must be performed by an independent contractor; approve Plans and Contract documents; authorize Chairman to sign the Plans for the Christmas Valley Phase 1 Erosion Control and Enhancement Project 95151; and said Department be authorized to advertise for construction bids for same. RECOMMENDED ACTION: Approve. FUNDING: California Tahoe Conservancy, United States Forest Service, and Tahoe Regional Planning Agency Water Quality Mitigation Funds
Attachments: 1. CV1_Loc-Map Figure A.pdf, 2. CV1 Blue.pdf
Title
Transportation Department recommending the Board find that the construction must be performed by an independent contractor; approve Plans and Contract documents; authorize Chairman to sign the Plans for the Christmas Valley Phase 1 Erosion Control and Enhancement Project 95151; and said Department be authorized to advertise for construction bids for same.
RECOMMENDED ACTION: Approve.

FUNDING: California Tahoe Conservancy, United States Forest Service, and Tahoe Regional Planning Agency Water Quality Mitigation Funds

Body
BUDGET SUMMARY: $
Total Estimated Cost $1,148,870.00

Funding
Budgeted $ 0
New Funding $
Savings $
Other * $1,148,870.00
Total Funding Available $1,148,870.00
Change To Net County Cost -0- $0
* to be included in FY 07-08 and FY 08-09 budgets.

Fiscal Impact/Change to Net County Cost:
There is no cost to the County General Fund. Funding for this Project has been secured from the California Tahoe Conservancy, the United States Forest Service, and the Tahoe Regional Planning Agency Water Quality Mitigation Funds.

Reason for Recommendation:
The Christmas Valley Phase 1 Erosion Control Project (Project) area is located in eastern El Dorado County, in the Lake Tahoe Basin, east of the Upper Truckee River, west of State Route 89. The Project area generally is bounded by the Upper Truckee River to the west, Portal Drive to the north, State Route 89 to the east, and Grass Lake Creek to the south. The Project area includes subdivisions Grass Lake Creek Nos. 1 & 2, a portion of River Park Estates Unit 2, and a Portion of Section 17 T.11.N R.18.E. MDM.

The Project consists of construction of erosion control improvements including curb and gutter with tie-in pavement, sediment traps, drainage inlets, culverts, headwalls, grass-lined channels, and rock-lined channels.

1) Construction Must be Performed by an Independent Contractor:
The Engineer's construction cost e...

Click here for full text