File #: 08-0247    Version:
Type: Agenda Item Status: Approved
File created: 2/11/2008 In control: Board of Supervisors
On agenda: 4/1/2008 Final action: 4/1/2008
Title: Transportation Department recommending Chairman be authorized to sign Task Order No. 2 under AGMT 07-1435 with Quincy Engineering, Inc. in an approximate amount of $378,000 to perform professional services necessary to complete the Geometric Approval Drawings for the U.S. 50 / El Dorado Hills Blvd Interchange (CIP 71323), upon review and approval by County Counsel. (Cont'd 3/25/08, Item 19) RECOMMENDED ACTION: Approve. FUNDING: 2004 General Plan Traffic Impact Mitigation Fee Program.
Title
Transportation Department recommending Chairman be authorized to sign Task Order No. 2 under AGMT 07-1435 with Quincy Engineering, Inc. in an approximate amount of $378,000 to perform professional services necessary to complete the Geometric Approval Drawings for the U.S. 50 / El Dorado Hills Blvd Interchange (CIP 71323), upon review and approval by County Counsel. (Cont'd 3/25/08, Item 19)
RECOMMENDED ACTION: Approve.

FUNDING: 2004 General Plan Traffic Impact Mitigation Fee Program.

Body
BUDGET SUMMARY:
Total Estimated Cost $ 378,000

Funding
Budgeted $ 378,000
New Funding $
Savings $
Other $
Total Funding Available $ 378,000
Change To Net County Cost $ 0

Fiscal Impact/Change to Net County Cost:
These consultant services are funded by the 2004 General Plan Traffic Impact Mitigation (TIM) Fee Program through the El Dorado Hills TIM Fee. The Department of Transportation (DOT) has sufficient revenues budgeted to fund this Task Order. There is no net County cost to the General Fund associated with this agenda item.

Background:
Direction from the Board at the regular meeting of March 27,2007, required all Task Orders exceeding $250,000 be approved by the Board prior to execution.

On March 20, 2007, the Board approved Task Order #2 under AGMT 05-935 with Quincy Engineering, Inc. (QEI). (This Task Order will be hereinafter referred to as "Old Task Order #2"). The scope of "Old Task Order #2" was to develop Geometric Approval Drawings (GADs) for the US 50 / El Dorado Hills Blvd Interchange (CIP #71323), US 50 Mainline Widening (CIP #53120) and the El Dorado Hills High Occupancy Vehicle (HOV) Lanes (CIP #53110), and the associated studies and reports needed to develop the GADs. Subsequently, DOT was successful in securing $20 million in Corridor Mobility Improvement Account (CMIA) grant funds for construction of the El Dorado Hills HOV Lanes (CIP #53110). However, the CMIA gr...