File #: 20-0582    Version: 1
Type: Agenda Item Status: Approved
File created: 4/20/2020 In control: Planning Commission
On agenda: 5/14/2020 Final action: 5/14/2020
Title: Department of Transportation recommends that the Planning Commission: 1) Approve the Finding of Consistency of the 2020 Annual Capital Improvement Program with the General Plan; and 2) Approve the Finding of Consistency of one additional project, South Tahoe Greenway - Upper Truckee River Bridge at Johnson Meadow (CIP 95201/36107023), to be included in the Annual Capital Improvement Program.
Attachments: 1. A - Findings of Consistency PC 05-14-20, 2. B - 2016 Overall Unfunded CIP PC 05-14-20, 3. C - 2020 Project Change Table PC 05-14-20
Related files: 20-0675

Title

Department of Transportation recommends that the Planning Commission:

1) Approve the Finding of Consistency of the 2020 Annual Capital Improvement Program with the General Plan; and

2) Approve the Finding of Consistency of one additional project, South Tahoe Greenway - Upper Truckee River Bridge at Johnson Meadow (CIP 95201/36107023), to be included in the Annual Capital Improvement Program.

 

Body

DISCUSSION / BACKGROUND

On March 24, 2020, the Board authorized additions and changes to the Capital Improvement Program (CIP), Legistar 20-0313, Item 29, for 2020.  The Board has chosen to approve the final 2020 CIP in June 2020.

 

A CIP is a planning document that identifies capital improvement projects (e.g., roads, bridges, etc.) a local government or public agency intends to build over a certain time horizon (usually between 5 and 20 years).  CIPs typically provide key information for each project, including a general scope, schedule (includes planning, design, and construction), cost and revenue sources.  The County’s CIP provides a means for the Board to define capital improvement project and funding priorities over a 20-Year horizon.

 

In order to maintain the integrity of its roadway network, the County is required to develop and maintain a 10- and 20-Year CIP pursuant to General Plan Policy TC-Xb and Implementation Measure TC-A. 

 

Attachment A provides a detailed discussion on the Findings of Consistency of the 2020 Annual CIP Update with the General Plan.  Staff is requesting the Planning Commission approve Findings of Consistency of the 2020 Annual CIP with the General Plan, including the new project, and changes to the projects as noted in Attachment B. 

 

CONTACT

John Kahling, Deputy Director, Engineering

Matthew Smeltzer, Deputy Director, Engineering

Department of Transportation