File #: 21-0201    Version: 1
Type: Agenda Item Status: Approved
File created: 2/2/2021 In control: Board of Supervisors
On agenda: 4/13/2021 Final action: 4/13/2021
Title: Department of Transportation recommending the Board adopt and authorize the Chair to sign Resolution 029-2021 adopting a list of projects funded in Fiscal Year 2021-22 by Senate Bill 1: The Road Repair and Accountability Act of 2017. FUNDING: Road Repair and Accountability Act of 2017 (SB1 - RMRA).
Attachments: 1. A - Blue Route, 2. B - Resolution, 3. C - SB1 Presentation, 4. Executed Resolution 029-2021
Related files: 22-0937
Title
Department of Transportation recommending the Board adopt and authorize the Chair to sign Resolution 029-2021 adopting a list of projects funded in Fiscal Year 2021-22 by Senate Bill 1: The Road Repair and Accountability Act of 2017.

FUNDING: Road Repair and Accountability Act of 2017 (SB1 - RMRA).
Body
DISCUSSION / BACKGROUND
Department of Transportation, Maintenance and Operations Division would like to present the methodology used to select the road projects to be funded by SB1 in Fiscal Year 2021-22 and request the Board to adopt and authorize the Chair to sign Resolution 029-2021 adopting a list of projects for Fiscal Year 2021-22. These projects are able to be identified due to funding received from the Road Repair and Accountability Act of 2017 (SB1 - RMRA). The County of El Dorado, Department of Transportation (Transportation) is authorized to receive the funding from the State of California due to the County providing a Maintenance of Effort (MOE) totaling $1,375,000 with local discretionary funding, Tribe. Fiscal Year 2021/22 proposed projects are as follows:

1. El Dorado Hills Boulevard Section One Surface Treatment
Project Description: El Dorado Hills Boulevard Section One Surface Treatment from Green Valley to Harvard Boulevard is a multi-year project. The first phases will concentrate on the preparation for the surface treatment. Phase one (1) will consist of roadside brushing of approximately 2.5 miles of roadway along El Dorado Hills Boulevard. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Phase two (2) will consist of roadside ditching and possible culvert repair. Ditching involves correcting drainage issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. Phase three (3) will consist of repairing damaged asphalt in the ...

Click here for full text