File #: 24-0056    Version: 1
Type: Agenda Item Status: Approved
File created: 12/21/2023 In control: Board of Supervisors
On agenda: 1/23/2024 Final action: 1/23/2024
Title: Department of Transportation recommending the Board consider the following pertaining to El Dorado Trail - Missouri Flat Road Bike/Pedestrian Overcrossing Phase 2 Project, Capital Improvement Program project number 36109002, Contract 8144: 1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and 2) Authorize advertisement for construction bids. FUNDING: Congestion Mitigation and Air Quality (23%), Road Fund (<1%), Active Transportation Program (56%), Regional Surface Transportation Program Federal Funds - Caltrans Local Assistance (17%), Transportation Development Act (3%). (Federal Funds)
Attachments: 1. A - Approved Contract Routing Sheet, 2. B - Contract Documents, 3. C - Plans, 4. Executed Plans Cover Page
Related files: 17-1246, 24-0528
Title
Department of Transportation recommending the Board consider the following pertaining to El Dorado Trail - Missouri Flat Road Bike/Pedestrian Overcrossing Phase 2 Project, Capital Improvement Program project number 36109002, Contract 8144:
1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and
2) Authorize advertisement for construction bids.

FUNDING: Congestion Mitigation and Air Quality (23%), Road Fund (<1%), Active Transportation Program (56%), Regional Surface Transportation Program Federal Funds - Caltrans Local Assistance (17%), Transportation Development Act (3%). (Federal Funds)
Body
DISCUSSION / BACKGROUND
The El Dorado Trail - Missouri Flat Road Bike/Pedestrian Overcrossing Phase 2 Project (Project) will construct a bicycle/pedestrian over-crossing as part of the El Dorado Trail at Missouri Flat Road.

This project is federally funded, therefore both California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) compliance is required. A CEQA Notice of Determination was recorded on December 20, 2017. A NEPA Categorical Exemption/Categorical Exclusion was approved on December 17, 2018 with a re-validation approved on May 30, 2023.

No environmental permits or right of way is needed for this Project.

The Contract Documents include all required federal provisions and incorporate the current Caltrans Disadvantaged Business Enterprise (DBE) requirements. The DBE goal is 21%.

Authorization for construction funding (E-76) has been received for this Project.

ALTERNATIVES
1) The Board could choose not to approve the Contract Documents. Transportation will make any changes requested by the Board and return at a later date.
2) The Board could choose not to authorize advertisement for construction bids. Transportation will make any changes requested by the Board and return at a later date.
3) The Board could choose to cancel the Project.

PRIOR BOARD ACTION
On Dec...