Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.

Meeting Details

Meeting Name: Diamond Springs and El Dorado Community Advisory Committee Agenda status: Final
Meeting date/time: 10/15/2026 5:00 PM Minutes status: Draft  
Meeting location: https://edcgov-us.zoom.us/j/84862400521
Board Meeting Room 330 Fair Lane, Building A Placerville, CA 95667 OR Live Streamed - Click link to view
Published agenda: Agenda Agenda Accessible Agenda Accessible Agenda Published minutes: Not available  
Agenda packet: Not available
Meeting video:  
Attachments:
File #Ver.Agenda #TypeTitleActionResultAction DetailsVideo
26-1297 11.Agenda ItemApproval of the Minutes from the regular meeting on July 16, 2026.   Not available Not available
26-1655 12.Agenda ItemDR26-0002 - New Behavioral Health Clinic (Jacob Bunting / El Dorado Community Health Centers - Caleb Sandford / Engineer Kelly Maves) DR26-0002: A Design Review application for proposed construction and operation of a 12,904 square foot Behavioral Health Clinic was previously presented on July 16, 2026. A motion was made to recommend the project for approval with the current aesthetics and building plans, as presented, and to have the project returned with more information about traffic, with Department of Transportation participation. The proposed Project is located on a 12.42-acre property adjacent to the existing Community Health Center which was constructed in 2022 on the same parcel. The parcel is located on the south side of Missouri Flat Road approximately 0.1 miles north of the intersection with Forni Road in the Placerville area, in El Dorado County Fire Protection District and Supervisor District 3.   Not available Not available
26-1656 13.Agenda ItemDiamond Springs and El Dorado Community Advisory Committee to review and make recommendations regarding the following project: TM18-1538/Z19-0005/PD19-0005 Dorado Oaks (Stonehenge Springs, LLC/ CTA Engineering & Surveying): A Rezone (Z19-0005) to apply the Planned Development Combining Zone (-PD) overlay to the Multi-unit Residential (RM) zoned portion of the project site (Exhibit C). The project applicant team agreed to bring the project to the DS-ED CAC prior to the release of the Final Environmental Impact Report (FEIR) and will present the project. A Draft Environmental Impact Report (DEIR) was prepared and circulated for public comment and review in 2021. A Final Environmental Impact Report (FEIR) is being prepared for public review. The project would subdivide (TM18-1538) approximately 142.29 acres into 157 single-unit residential lots with lot sizes ranging from 6,000 square feet to 24,000 square feet and 225 multi-unit lots ranging in size from 2,000 square feet to 7,170 square feet. The map would create four public roadway lots or approximately 7.12-acres, seven private road   Not available Not available