Title
Hearing to consider Crown Castle Cell Tower Replacement (Conditional Use Permit CUP-R21-0008) to allow the modification and continued operation of a wireless communication facility including the removal of a 60-foot-tall monopole and replacement with a 90-foot-tall monopole to reside within the currently existing lease area. The 90-foot-tall monopole will include 12 new Verizon wireless antennas in addition to all currently existing mounted equipment. An additional 10-foot by 18-foot proposed Verizon wireless lease area will house two (2) outdoor equipment cabinets, one (1) standby emergency generator, and concealment fencing around the whole lease area perimeter. All T-Mobile antennas and ground equipment within the currently existing lease area will remain in operation on property identified by Assessor’s Parcel Number 325-290-006, consisting of 10.3 acres, is located on the east side of Gold Nugget Way, approximately 400-feet south of the intersection with Forni Road, in the unincorporated Placerville area, submitted by Streamline Engineering & Design C/O Alyse Mathis; and staff recommending the Planning Commission take the following actions:
1) Find the project is consistent with the Negative Declaration adopted for the prior approved S96-0004 pursuant to Section 15162 of CEQA Guidelines (Subsequent EIRs and Negative Declarations); and
2) Approve Conditional Use Permit CUP-R21-0008 based on the Findings and subject to the Conditions of Approval as presented.
(Supervisorial District 3)
Body
DISCUSSION / BACKGROUND
Conditional Use Permit CUP-R21-0008/Crown Castle Cell Tower Replacement submitted by STREAMLINE ENGINEERING & DESIGN C/O ALYSE MATHIS to allow the modification and continued operation of a wireless communication facility including the removal of a 60-foot-tall monopole and replacement with a 90-foot-tall monopole to reside within the currently existing lease area. The 90-foot-tall monopole will include 12 new Verizon wireless antennas in add...
Click here for full text