File #: 20-1507    Version: 1
Type: Agenda Item Status: Approved
File created: 11/4/2020 In control: Board of Supervisors
On agenda: 12/8/2020 Final action: 12/8/2020
Title: Department of Transportation recommending the Board take the following actions related to the Green Valley Road Slipout Repair Project, CIP 78707 / 36102008, Contract 2776: 1) Retroactively approve and authorize the Board Chair to execute Contract Change Order 5 with Drill Tech Drilling and Shoring, Inc. in the amount of $169,326.37; and 2) Find that an exception to the competitive bidding requirement exists for the work described and that a waiver of competitive bidding is appropriate for Contract Change Order 5. FUNDING: Federal Highway Administration anticipated reimbursement (88.53%), California Disaster Assistance Act anticipated reimbursement (8.6%), and RSTP Exchange Funds - Caltrans (2.87%). (Local, State, and Federal Funds).
Attachments: 1. A - Contract Change Order No. 5, 2. Executed Contract 2776; CIP No. 78707
Related files: 18-1250, 19-1420, 18-1967, 21-0833
Title
Department of Transportation recommending the Board take the following actions related to the Green Valley Road Slipout Repair Project, CIP 78707 / 36102008, Contract 2776:
1) Retroactively approve and authorize the Board Chair to execute Contract Change Order 5 with Drill Tech Drilling and Shoring, Inc. in the amount of $169,326.37; and
2) Find that an exception to the competitive bidding requirement exists for the work described and that a waiver of competitive bidding is appropriate for Contract Change Order 5.

FUNDING: Federal Highway Administration anticipated reimbursement (88.53%), California Disaster Assistance Act anticipated reimbursement (8.6%), and RSTP Exchange Funds - Caltrans (2.87%). (Local, State, and Federal Funds).
Body
DISCUSSION / BACKGROUND
The contract for the Green Valley Road Slipout Repair Project (Project) was approved by the Board on January 29, 2019, Item 21, Legistar 18-1967, and the Notice to Proceed was issued for June 27, 2019. Project construction began in July 2019. The first item of work for Drill Tech Drilling and Shoring, Inc. (Drill Tech) was to identify actual location(s) of the broadband fiber optic utility existing at the site. The Project plans included anticipated depths for the utility based on as-built drawings provided by the utility company. However, after unsuccessful attempts to locate the utility, it was discovered that the fiber optic line was installed at much greater depths than was originally anticipated. The Department of Transportation (Transportation) directed Drill Tech to pothole the additional depths and locations as extra work. After coordination with the utility company, it appeared that the fiber optic line would require relocation in order for the Project to be constructed. Accordingly, Transportation directed Drill Tech to demobilize equipment from the site, also as extra work. On June 30, 2020, after further investigation of the fiber optic line location, the utility company not...