File #: 22-0521    Version: 1
Type: Agenda Item Status: Approved
File created: 3/11/2022 In control: Board of Supervisors
On agenda: 6/14/2022 Final action: 6/14/2022
Title: Department of Transportation recommending the Board: 1) Authorize the Chair to sign Resolution 086-2022 and adopt the 2022 Capital Improvement Program (CIP) as presented in Attachment A; 2) Authorize the addition of one new project to the Airport program section of the 2022 CIP Book: a) Install New Precision Approach Path Indicator (PAPI) Runway 5 and Remove Existing Visual Approach Slope Indicator (VASI), CIP 35401010; 3) Authorize the addition of $500,000 in Tribe Funds to the Ponderosa Road Bicycle and Pedestrian Improvements Project, CIP 36109009; and 4) Remove Ice House Road Guardrail Safety Project, CIP 36105074, and include the scope of this project with the Ice House Road Rehabilitation Phase 2 Project, CIP 36105023. FUNDING: Various Federal, State, and Local funding sources, including Traffic Impact Fee Program, Missouri Flat Area Master Circulation and Financing Plan, Road Fund, Tribe Funds, Accumulative Capital Outlay, Developer Advanced Funds, Sacramento Municipal Util...
Attachments: 1. A - 2022 CIP Book Adoption Resolution, 2. B - Approved Resolution Route Sheet, 3. C - Planning Commission Finding of Consistency, 4. D - 2022 Project Change Table, 5. E - Proposed 2022 CIP Book, 6. Executed Resolution 086-2022
Related files: 22-0284, 22-0614, 23-1057, 22-1882, 23-0339, 23-0055
Title
Department of Transportation recommending the Board:
1) Authorize the Chair to sign Resolution 086-2022 and adopt the 2022 Capital Improvement Program (CIP) as presented in Attachment A;
2) Authorize the addition of one new project to the Airport program section of the 2022 CIP Book:
a) Install New Precision Approach Path Indicator (PAPI) Runway 5 and Remove Existing Visual Approach Slope Indicator (VASI), CIP 35401010;
3) Authorize the addition of $500,000 in Tribe Funds to the Ponderosa Road Bicycle and Pedestrian Improvements Project, CIP 36109009; and
4) Remove Ice House Road Guardrail Safety Project, CIP 36105074, and include the scope of this project with the Ice House Road Rehabilitation Phase 2 Project, CIP 36105023.

FUNDING: Various Federal, State, and Local funding sources, including Traffic Impact Fee Program, Missouri Flat Area Master Circulation and Financing Plan, Road Fund, Tribe Funds, Accumulative Capital Outlay, Developer Advanced Funds, Sacramento Municipal Utility District, and/or General Fund.

Body
BACKGROUND/DISCUSSION
The Capital Improvement Program (CIP) is the long-range plan for all individual transportation capital improvement projects, including cost estimates, schedules, and funding sources. It provides strategic direction for capital projects over a current year, 5-, 10-, and 20-year horizon. The CIP is used by the Department of Transportation (Transportation) as a planning tool and is updated annually as new information becomes available regarding Board priorities, funding sources, project cost estimates, and timing.

In order to ensure that traffic generated by growth consistent with the General Plan does not exceed available roadway capacity, the County is required to implement General Plan Policy TC-Xb and Implementation Measures TC-A and TC-B. General Plan Policy TC-Xb and Implementation Measure TC-A requires the County to prepare an annual CIP for the West Slope Road/Bridge Program specifying expenditures for ro...

Click here for full text