File #: 18-0624    Version: 1
Type: Agenda Item Status: Approved
File created: 4/11/2018 In control: Board of Supervisors
On agenda: 5/15/2018 Final action: 5/15/2018
Title: Community Development Services, Department of Transportation, recommending the Board consider the following pertaining to the 2017 Happy Valley Road Storm Damage Repair Project, Contract 2769, PW 17-31206, CIP 78724: 1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and 2) Authorize advertisement for construction bids. FUNDING: Local and State discretionary funding initially (100%), with Transportation staff working with the Federal Emergency Management Agency and California Office of Emergency Services to obtain reimbursement of up to 97.12% of total project costs. (Local/State/Federal)
Attachments: 1. A - Contract Docs, 2. B - Plan Set, 3. C - Vicinity Map, 4. D - Road Closure Authorization, 5. E - Counsel Approval, 6. Executed Plans
Related files: 17-0300, 19-0166, 18-0879
Title
Community Development Services, Department of Transportation, recommending the Board consider the following pertaining to the 2017 Happy Valley Road Storm Damage Repair Project, Contract 2769, PW 17-31206, CIP 78724:
1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and
2) Authorize advertisement for construction bids.

FUNDING: Local and State discretionary funding initially (100%), with Transportation staff working with the Federal Emergency Management Agency and California Office of Emergency Services to obtain reimbursement of up to 97.12% of total project costs. (Local/State/Federal)
Body
DEPARTMENT RECOMMENDATION
Community Development Services (CDS), Department of Transportation (Transportation), recommending the Board consider the following pertaining to the 2017 Happy Valley Road Storm Damage Repair Project (Project), Contract No. 2769, PW No. 17-31206, CIP No. 78724:
1) Approve and adopt the Plans and Contract Documents and authorize the Chair to sign the Plans; and
2) Authorize advertisement for construction bids (the total estimated cost for the Project’s construction phase is $580,000.00).

DISCUSSION / BACKGROUND
This Project is necessary to repair damage to Happy Valley Road caused by the storms of 2017. The Project consists of drainage, roadway, retaining wall and ditch improvements to repair a failed culvert and section of the roadway that includes: installing 60” storm drainage manhole with grate, installing 30” reinforced concrete pipe culvert, installing concrete reinforced retaining wall with micropiles, removal of an existing 16” steel culvert, roadway excavation, installing Class 2 AB, installing HMA (Type A) and installing rock slope protection. The roadway will remain closed for the duration of this Project.

Happy Valley Road will be fully closed to traffic for forty-three (43) calendar days. Access through the closed area will be via a detour to Mount Aukum Road and Happy Valle...

Click here for full text