File #: 19-1158    Version: 1
Type: Agenda Item Status: Approved
File created: 7/22/2019 In control: Board of Supervisors
On agenda: 9/10/2019 Final action: 9/10/2019
Title: Department of Transportation recommending the Board consider the following for acquiring right of way for the Industrial Drive/Missouri Flat Road-Signalization Project CIP 73366/36105053 (Project): 1) Approve and authorize the Chair to sign the Acquisition Agreement for Public Purposes and the Certificates of Acceptance accepting a Grant Deed, Temporary Construction Easement, and Public Utility Easement from Irene Mazzoni, a single woman, for Assessor’s Parcel Number 329-260-01. The Fee and Easement acquisitions provide right-of-way necessary to construct the Project, at a cost of $31,500; 2) Authorize the Director of Transportation, or designee, to execute the escrow instructions and any other related escrow documents pertaining to the transaction, including payment of title and escrow fees, which are estimated to be $2,500; and 3) Authorize the Director of Transportation, or designee to extend the date of closure of escrow upon mutual agreement of both parties if necessary. FUN...
Attachments: 1. A - Blue Routing Sheet, 2. B - Acquisition Agreement, 3. C - Grant Deed + COA, 4. D - Temporary Construction Esmt + COA, 5. E - Public Utility Esmt + COA, 6. F - Vicinity Map, 7. Executed Agreement, 8. Executed Grant of Temporary Construction Easement, 9. Executed Grant Deed, 10. Executed Grant of Public Utility Easement
Related files: 19-0522, 19-0375, 18-1702, 18-1493, 18-0616, 18-0596, 21-0654
Title
Department of Transportation recommending the Board consider the following for acquiring right of way for the Industrial Drive/Missouri Flat Road-Signalization Project CIP 73366/36105053 (Project):
1) Approve and authorize the Chair to sign the Acquisition Agreement for Public Purposes and the Certificates of Acceptance accepting a Grant Deed, Temporary Construction Easement, and Public Utility Easement from Irene Mazzoni, a single woman, for Assessor’s Parcel Number 329-260-01. The Fee and Easement acquisitions provide right-of-way necessary to construct the Project, at a cost of $31,500;
2) Authorize the Director of Transportation, or designee, to execute the escrow instructions and any other related escrow documents pertaining to the transaction, including payment of title and escrow fees, which are estimated to be $2,500; and
3) Authorize the Director of Transportation, or designee to extend the date of closure of escrow upon mutual agreement of both parties if necessary.

FUNDING: Tribe Funds (14%), General Fund (54%), and Accumulative Capital Outlay Funds (32%).
Body
DISCUSSION/BACKGROUND
Construction of the Sheriff’s new Public Safety Facility requires installation of a traffic signal at the Industrial Drive/Missouri Flat Road intersection to accommodate traffic utilizing the facility. Intersection improvements include installation of a traffic signal controller and cabinet, detector loops, and widening of both Missouri Flat Road and Industrial Drive to accommodate turn lanes.

Missouri Flat Road will be widened north and south of the intersection for right and left turn lanes. Industrial Drive will also be realigned slightly to the south and widened to accommodate a left turn lane and improve sight distance at the intersection. Concrete curb ramps will be constructed to Americans with Disabilities Act standards at three of the intersection legs along with crosswalks to accommodate pedestrians along Missouri Flat Road and Industrial Drive. ...

Click here for full text